Jinan Diesel Jichai 12V190 Engine Parts Valve Spring Removal Tool 307.42.02 Maintenance Special Tool Cylinder Liner Chidong 12vb. 42.100

Product Details
Customization: Available
Conditions
of Use:
Trailer Type, Marine, Land Use
Usage: Emergency Crew, Standby Unit, Common Units
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Gold Member Since 2025

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

  • Jinan Diesel Jichai 12V190 Engine Parts Valve Spring Removal Tool 307.42.02 Maintenance Special Tool Cylinder Liner Chidong 12vb. 42.100
  • Jinan Diesel Jichai 12V190 Engine Parts Valve Spring Removal Tool 307.42.02 Maintenance Special Tool Cylinder Liner Chidong 12vb. 42.100
  • Jinan Diesel Jichai 12V190 Engine Parts Valve Spring Removal Tool 307.42.02 Maintenance Special Tool Cylinder Liner Chidong 12vb. 42.100
  • Jinan Diesel Jichai 12V190 Engine Parts Valve Spring Removal Tool 307.42.02 Maintenance Special Tool Cylinder Liner Chidong 12vb. 42.100
  • Jinan Diesel Jichai 12V190 Engine Parts Valve Spring Removal Tool 307.42.02 Maintenance Special Tool Cylinder Liner Chidong 12vb. 42.100
  • Jinan Diesel Jichai 12V190 Engine Parts Valve Spring Removal Tool 307.42.02 Maintenance Special Tool Cylinder Liner Chidong 12vb. 42.100
Find Similar Products
  • Overview
  • Product Description
  • Our Services
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
307.42.02
Output Type
AC Three Phase
Cooling
Method
Water Cooling
Installation
Method
Fixed
Generator
Type
Diesel Generator
Selling Units
Single Item
Delivery Time
5-7 Working Days
Quality Class
High Quality
Single Package Size
100X100X50.Cm
Material
Stainless Steel,Iron
MOQ
1 Set
Type
Diesel Engine Part
Product Name
OEM Chidong Engine Generator Spare Parts Upper Ho
Single Gross Weight
5.000kg
Generator Type
Diesel Generator
Application
Diesel & Gas Generator Set
Stock
in Stock
Tool1
Sleeve Liner
Tool2
Flywheel Liner
Tool3
Piston Clamp
Transport Package
Carton or Plywood Box
Specification
12vb. 42.100
Trademark
jichai
Origin
Shandong, China
HS Code
8409999990
Production Capacity
100000PCS/Year

Packaging & Delivery

Package Size
20.00cm * 15.00cm * 10.00cm
Package Gross Weight
2.000kg

Product Description

Jinan diesel Jichai 12V190 engine parts Valve spring removal tool 307.42.02 Maintenance Special Tool Cylinder Liner Chidong 12vb.42.100 

Product Description

Applied gensets

1. JDEC Chidong engine gas or diesel

2. 190 series: 4190,6190,8190,12V190,16V190

3. 100% original & high quality We provide all brand new spare parts for Jichai Chidong diese and gas engine with competitive price and short delivery time.

Jinan Diesel Jichai 12V190 Engine Parts Valve Spring Removal Tool 307.42.02 Maintenance Special Tool Cylinder Liner Chidong 12vb. 42.100Jinan Diesel Jichai 12V190 Engine Parts Valve Spring Removal Tool 307.42.02 Maintenance Special Tool Cylinder Liner Chidong 12vb. 42.100

Jinan Diesel Jichai 12V190 Engine Parts Valve Spring Removal Tool 307.42.02 Maintenance Special Tool Cylinder Liner Chidong 12vb. 42.100

Our Services

 

We supply varieties of engine spare parts for Jichai,Shengdong, chidong series gas and diesel engine.

 

Gaskets: upper/lower gaskets, pump/turbocharger repair kits

Filter: oil filter, air filter, fuel filter, water filter

Pump: water pump,fuel pump, oil pump, sea water pump

Cylinder Block: cylinder liner, oil seal, crankshaft, main bearing

Camshaft: camshaft, gear, cam follower, rocker lever cover

Cyliner Head: intake/exhaust valve, guide, spring

Connecting Rod And Piston: piston, piston ring, piston pin,connecting rod bearing

Starter, alternator

Fan, fan hub, fan belt, fan spacer

Oil pan, exhaust manifold, connection, hose

Injector and injector parts

Turbocharger, flywheel, belt

Jinan Diesel Jichai 12V190 Engine Parts Valve Spring Removal Tool 307.42.02 Maintenance Special Tool Cylinder Liner Chidong 12vb. 42.100
Jinan Diesel Jichai 12V190 Engine Parts Valve Spring Removal Tool 307.42.02 Maintenance Special Tool Cylinder Liner Chidong 12vb. 42.100
Jinan Diesel Jichai 12V190 Engine Parts Valve Spring Removal Tool 307.42.02 Maintenance Special Tool Cylinder Liner Chidong 12vb. 42.100
Jinan Diesel Jichai 12V190 Engine Parts Valve Spring Removal Tool 307.42.02 Maintenance Special Tool Cylinder Liner Chidong 12vb. 42.100
Jinan Diesel Jichai 12V190 Engine Parts Valve Spring Removal Tool 307.42.02 Maintenance Special Tool Cylinder Liner Chidong 12vb. 42.100
Jinan Diesel Jichai 12V190 Engine Parts Valve Spring Removal Tool 307.42.02 Maintenance Special Tool Cylinder Liner Chidong 12vb. 42.100
 

 

Packaging & Shipping

Packing: We usually pack goods in neutral cartons and plywood cases. We also supply customized packing.

Delivery: For spare parts, we usually deliver by air or by express. For bulk cargo, we usually ship by sea to the port of destination.

Jinan Diesel Jichai 12V190 Engine Parts Valve Spring Removal Tool 307.42.02 Maintenance Special Tool Cylinder Liner Chidong 12vb. 42.100
Jinan Diesel Jichai 12V190 Engine Parts Valve Spring Removal Tool 307.42.02 Maintenance Special Tool Cylinder Liner Chidong 12vb. 42.100

 

FAQ

 Q1. What is your packing?
A: We usually pack goods in neutral cartons and plywood cases. We also supply customized packing. We'll show you photos of items and packages before delivery.

Q2. What is your transport?

A: For spare parts, we usually deliver by air or by express. For bulk cargo, we usually ship by sea to the port of destination. After shipment, we will track items until you receive them.

Q3. What is your terms of payment?

A:  30% TT in advance as deposit, and 70% balance paid before delivery. 

Q4. What is your terms of price?

A: EXW, FOB, CIF, CFR.

Q5. How about your delivery time?

A: We will arrange shipment within 2-5 working days after we receive advance payment. Specific time depends on items and quantities of your order.

Q6. Do you test all your goods before delivery?

A: Yes, we have 100% test before delivery.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier