Shengdong 500kw Gas Generator Gas Engine Electric Fuel Pre-Supply Pump 307.54.00

Product Details
Customization: Available
Conditions
of Use:
Car Type, Trailer Type, Marine, Land Use
Usage: Emergency Crew, Standby Unit, Common Units
Gold Member Since 2025

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

  • Shengdong 500kw Gas Generator Gas Engine Electric Fuel Pre-Supply Pump 307.54.00
  • Shengdong 500kw Gas Generator Gas Engine Electric Fuel Pre-Supply Pump 307.54.00
  • Shengdong 500kw Gas Generator Gas Engine Electric Fuel Pre-Supply Pump 307.54.00
  • Shengdong 500kw Gas Generator Gas Engine Electric Fuel Pre-Supply Pump 307.54.00
  • Shengdong 500kw Gas Generator Gas Engine Electric Fuel Pre-Supply Pump 307.54.00
  • Shengdong 500kw Gas Generator Gas Engine Electric Fuel Pre-Supply Pump 307.54.00
Find Similar Products
  • Overview
  • Detailed Photos
  • Shengdong&Chidong engine parts
  • Our Advantages
  • Packing & Delivery
  • Warehouse & Workshop
  • Customer visiting
  • FAQ
Overview

Basic Info.

Model NO.
307.54.00/12VB. 54.00C
Output Type
AC Three Phase
Cooling
Method
Water Cooling
Installation
Method
Fixed
Generator
Type
Gas and Diesel Generator
Condition
100% Brand New
Engine Model
Shengdong 500kw
Delivery Time
1-2 Working Days
MOQ
1PCS
Certification
ISO9001
Engine Type
Diesel & Gas Enigne
Pump No.: 1
307.54.00
Pump No.: 2
12vb.54.00c
Transport Package
Plywood Case by Sea, Air or Land
Trademark
Jichai, Shengdong
Origin
Shandong, China
HS Code
8409999990
Production Capacity
200PCS/Week

Product Description

Official agent supply 12V190 engine spare parts, OEM from Jichai Chidong and Shengdong factory.

 

Shengdong 500kw gas generator gas engine Electric Fuel Pre-supply Pump 307.54.00

 
Part Name
Electric Fuel Pre-supply pump
Spare parts code
307.54.00 / 12VB.54.00
Application engine
Shengdong 12V190 
Packing
Original plywood case
Condition
100% brand new
Detailed Photos
Shengdong 500kw Gas Generator Gas Engine Electric Fuel Pre-Supply Pump 307.54.00
Shengdong 500kw Gas Generator Gas Engine Electric Fuel Pre-Supply Pump 307.54.00
 
Shengdong&Chidong engine parts

Chidong 12v190 diesel engine Piston and connection rod assembly (as reference)

Ref. No.
Part Number
Description
Z12VB.05.00-Qty
1
12VB.05.09B
Compression ring (top)
1
2
12VB.05.11
Compression ring
2
3
12VB.05.20
Spring expander oil ring
1
4
Z12VB.05.01C
Piston
1
5
12VB.05.08A
Piston pin
1
6
12VB.05.14
Retain, piston pin
2
7
12VB.05.10.07
Dowel pin
1
8
12VB.05.10.02
Connection rod cap
1
9
12VB.05.10.03
Connection rod bolt
4
10
12VB.05.10.05
Connection rod bearing, lower
1
11
12VB.05.10.04
Connection rod bearing, upper
1
12
12VB.05.10.06
Washer
4
13
12VB.05.10.09
Connection rod nut
4
14
12VB.05.10.01
Connection rod
1
15
12VB.05.10.08
Small end bushing
1

Shengdong 500kw Gas Generator Gas Engine Electric Fuel Pre-Supply Pump 307.54.00
12v190 gas engine Piston and connection rod assembly (as reference)

Ref. No. Part Number Description
1. 12VB.05.14 Retain, piston pin
2. 12VB.05.08A Piston pin,piston pin
3. W12V190.05.01 Piston
4. 12VB.05.20 Ring,piston-oil
5. 12VB.05.11 Ring,piston-compression
6. 12VB.05.09B Ring,piston-compression (top)
7. 12VB.05.10.01 Connection rod
8. 12VB.05.10.08 Bushing,piston pin
9. 12VB.05.10.03 Bolt, connection rod
10. 12VB.05.10.04 Bearing, upper,connecting rod assembly
11. 12VB.05.10.05 Bearing, lower,connecting rod assembly
12. 12VB.05.10.02 Cap,connection rod
13. 12VB.05.10.06 Washer
14. 12VB.05.10.09 Nut, connecting rod
15. 12VB.05.10.07 Dowel pin
 
Shengdong 500kw Gas Generator Gas Engine Electric Fuel Pre-Supply Pump 307.54.00
Shengdong 500kw Gas Generator Gas Engine Electric Fuel Pre-Supply Pump 307.54.00
Our Advantages

1.We are professional in dealing with generators and spare parts for over 10 years.
2. Fine cooperation with original factories to make sure of goods steady and in time delivery.
3.After sale service available within 0- 12 hours.
4.Quick response and quotation.

Packing & Delivery
 
Shipment : Carton,plywood case or pallet will be used to pack goods.
Depends on emergency situation, shipment by sea,air or express(FedEx, TNT, DHL,UPS ) can be as choice.
Shengdong 500kw Gas Generator Gas Engine Electric Fuel Pre-Supply Pump 307.54.00
Warehouse & Workshop
 
Shengdong 500kw Gas Generator Gas Engine Electric Fuel Pre-Supply Pump 307.54.00
 
Customer visiting
 
Shengdong 500kw Gas Generator Gas Engine Electric Fuel Pre-Supply Pump 307.54.00
 
FAQ

Q1. What is your packing?
A:Carton, pallet or plywood case, depends on quantity.

Q2. Shipment?
A: By sea, air or express, as your needs.

Q3.Payment Choice?
A: Trade here on MIC, TT(30%+70%,or 100%),L/C.

Q4. Lead time?
A: 1-7 working days, depends on quantity.

Q5.Storage capacity?
A: 99% Spare parts are available in stocks. If in emergency, 8-15 days can arrive in Africa. 6-8 days deliver to Thailand by express.



You are highly welcomed to leave message and contact me by sending enquiry.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier