Customization: | Available |
---|---|
Certification: | CCC, COP, ISO9001, CE |
Standard Component: | Standard Component |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Part Name
|
Piston Rod Connection bearing |
Spare parts code
|
Z12VB.05.10.04/05 |
Application engine
|
Jichai chidong: 12V190, 6190, 8190
|
Packing
|
Original plywood case
|
Condition
|
100% brand new
|
Ref. No. | Part Number | Description | Z12VB.05.00-Qty |
1 | 12VB.05.09B | Compression ring (top) | 1 |
2 | Z12VB.05.11 | Compression ring | 2 |
3 | Z12VB.05.20 | Spring expander oil ring | 1 |
4 | Z12VB.05.01C | Piston | 1 |
5 | Z12VB.05.08A | Piston pin | 1 |
6 | Z12VB.05.14 | Retain, piston pin | 2 |
7 | Z12VB.05.10.07 | Dowel pin | 1 |
8 | Z12VB.05.10.02 | Connection rod cap | 1 |
9 | Z12VB.05.10.03 | Connection rod bolt | 4 |
10 | Z12VB.05.10.05 | Connection rod bearing, lower | 1 |
11 | Z12VB.05.10.04 | Connection rod bearing, upper | 1 |
12 | Z12VB.05.10.06 | Washer | 4 |
13 | Z12VB.05.10.09 | Connection rod nut | 4 |
14 | Z12VB.05.10.01 | Connection rod | 1 |
15 | Z12VB.05.10.08 | Small end bushing | 1 |
All series of Shengdong and Jichai Chidong(JDEC) generators and spare parts.
10W12V190.01.00 | Cylinder block | 10W12V190.09.00 | Exhaust system |
12vb.02.00 | Crankshaft | F700WTEM2.14.00 | Gas intake piping |
W12V190.03.00 | Cylinder head | 10W12V190.15.00C | Null pick-up transmission |
10W12V190.04.00 | Oil pan | 12V.17.00C | Oil pump |
W12V190.05.00 | Piston and connecting rod | 10W12V190.18.00 | Oil filter |
10W12V190.06.00-I | Camshaft and gear train | 12VB.19.00 | Centrifugal filter |
12VB.07.00 | Damper | 10W12V190.20.00A | Lubricating piping |
10W12V190.08.00 | Intake system | C12V190.21.00 | Oil cooler |
1. We are professional in dealing with generators and spare parts for over 10 years.
2. Fine cooperation with original factories to make sure of goods steady and in time delivery.
3.After sale service available within 0- 12 hours.
Q1. What is your packing?
A:Carton, pallet or plywood case, depends on quantity.
Q2. Shipment?
A: By sea, air or express, as your needs. If in emergency, 8-15 days can arrive in Africa.
Q3.Payment Choice?
A:Trade here on MIC, TT(30%+70%,or 100%) Or L/C.
Q4. Lead time?
A: 1-7 working days, depends on quantity.
Q5.Storage capacity?
A: 99% Spare parts are available in stocks. 6-8 days deliver to Thailand by express.