Pz12V190b Diesel Engines Chidong Generator Supporting Power of Mud Pump

Product Details
Customization: Available
After-sales Service: 12 Months
Warranty: One Year
Gold Member Since 2025

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

  • Pz12V190b Diesel Engines Chidong Generator Supporting Power of Mud Pump
  • Pz12V190b Diesel Engines Chidong Generator Supporting Power of Mud Pump
  • Pz12V190b Diesel Engines Chidong Generator Supporting Power of Mud Pump
  • Pz12V190b Diesel Engines Chidong Generator Supporting Power of Mud Pump
  • Pz12V190b Diesel Engines Chidong Generator Supporting Power of Mud Pump
  • Pz12V190b Diesel Engines Chidong Generator Supporting Power of Mud Pump
Find Similar Products
  • Overview
  • Specifications
  • Successful case
  • FAQ
Overview

Basic Info.

Model NO.
PZ12V190B
Type
Basic Diesel Generator
Installation Method
Fixed
Stroke
Four Stroke
Cooling Method
Water Cooling
Output Type
AC Three Phase
Speed
1500rpm
Conditions of Use
Land Use
Usage
Standby Unit
Landuse Type of Unit
Ordinary
Excitation Mode
Brushless
Condition
Brand New
Options
Remote Control
Starting System
24V DC Electric Start
Weight
8200kg
Rated Voltage
110-480
Product Name
Pz12V190b Diesel Engines
Frequency
50/60Hz
Protection
Overload Protection
Fuel Type
Diesel
Transport Package
Nude in Container
Specification
735-1000kw
Trademark
Ziyou
Origin
Shandong
HS Code
8408201001
Production Capacity
1000sets/Year

Product Description

PZ12V190B diesel Engines chidong diesel Generator Supporting Power of Mud Pump for Oil Drilling
Specifications
Model
PZ12V190B
12 hours power
882kw
Rated speed
1500r/min
Fuel oil consumption
≤209g/kW·h
Lubricant oil consumption
≤1.6g/kW·h
L×B×H(mm) Overall size
4301*1980*2678
Net weight
7500kg
Cylinder and Configuration
12 Cylinders, Vee 60°
Type
4-stroke, with turbocharger, intercooler and electronic air/fuel mixer, forced water cooling, direct injection
Bore
190mm
Stroke
215mm
Total displacement
71.45L
Compression ratio
14:1
Direction of Rotation
Counterclockwise(Facing flywheel)
Starting method
Air motor, electric motor
Lubricating method
Pressure and splashing
Speed regulating mothod
Mechanical speed governor, stable speed drop≤8%
Cooling system
Closed type cooling, pure copper water tank
 
Pz12V190b Diesel Engines Chidong Generator Supporting Power of Mud Pump
Pz12V190b Diesel Engines Chidong Generator Supporting Power of Mud Pump
Pz12V190b Diesel Engines Chidong Generator Supporting Power of Mud Pump
Pz12V190b Diesel Engines Chidong Generator Supporting Power of Mud Pump
Pz12V190b Diesel Engines Chidong Generator Supporting Power of Mud Pump
Pz12V190b Diesel Engines Chidong Generator Supporting Power of Mud Pump
 
 
 
Successful case
Pz12V190b Diesel Engines Chidong Generator Supporting Power of Mud Pump
1. Russia project
The project is located in Russia, using 3 sets of 600kw natural gas-fired internal combustion generator sets. After the project operation, it provided stable power and heat for the customer's plant.
2. Rongcheng Garden Hotel Distributed Energy Station Project.The project is located in the basement of Rongcheng Garden Hotel, Changsha, using
3 sets1.1MW natural gas-fired internal combustion generator sets.After the project is put into operation, the annual power generation capacity is
4.224 million kW, and the annual standard coal can be saved by 1348.6 tons. The comprehensive utilization rate can reach 70%-85%.
3. Changsha Huanghua International Airport T2 Terminal ProjectThis project is located in Changsha City, Hunan Province, using 1.1mw
natural gas generator.
4.Chengdu Biomass Gas Generation Project.The project is located in Chengdu, with a installed capacity of LY800GH-S biomass gas
generator set. It uses tar-free biomass gas fuel. When the low heat value is1200kcal/m3, the unit power is 800 kW.
5.Changde Jinshi biogas project.Provided 2 x 1.1MW biogas generator sets forChangde Jinshi Biogas Project, and theproject is under construction.
6. Xiaohuigou Coal Mine Low Concentration Gas Power Generation Project
The project is located in Xiaohuigou Coal Mine, Mayutown, Qingxu County, Shanxi Province.
The construction scale is 10MW, and the annual power generation is expected to be
7200×104kW•h. Provides 10×1MW low-concentration gas engine.
Pz12V190b Diesel Engines Chidong Generator Supporting Power of Mud PumpPz12V190b Diesel Engines Chidong Generator Supporting Power of Mud Pump
 
 
 
Recommended by seller
 

PZ8V190 Z8V190J G8V190ZL G8V190ZL-1 diesel Engine Spare Parts for Sale

$35.00 / set

1 set

Jinan Jichai 12V190 Maintenance Special Tool Cylinder Liner Chidong 12vb.42.100 307.42.02

$192.00 / set

1 set

Chidong 190 Cylinder Head Spring Z12V.03.17A &18A Generator Spare Parts 12V190 Chidong Engine Parts

$3.00 / piece

5 pieces

Shengdong St710 Starting Motor 12vb.46.03 for Model 500GF1-2RW/2PWW Gas Engine 127.46.00

$580.00 / set

1 set

12VB.17.00C Oil Pump Assembly for Shengdong 600GF1-1RWD/1PWWD Gas Engine

$110.00 / set

1 set

Jichai Chidong 12vb.22.00B Half-open Vane Water Pump for PZ12v190B G12V190PZL diesel Engine Generator Spare Parts

$104.00 / set

1 set

12VB.03.37A/D/B/C Inlet Exhaust Valve for 12V190 Jinan diesel Engine Generator Spare Parts

$16.00 / piece

10 pieces

Generator W16V190.36.10 air Filter Jinan H16V190ZL-2000KW Diesel Engine Spare Parts

$30.00 / set

10 sets

Jinan Engine Spare 12V190 Generator Parts Z12V.12.00 Injection Fuel Assemble with Mechanical Governor

$860.00 / set

1 set

Chidong Jichai 12vb.05.09c Piston Ring Chinese Professional Supplier High Quality diesel Generator Spare Parts

$35.00 / set

1 set

Z12V190B PZ12V190B G12V190ZL-1 G12V190PZL-1 G12V190PZL-3 Engine Spare Parts of Series 190 diesel Engine

$40.00 / set

1 set

FAQ
Q1. How to find suitable generator?
A:Tell me how many kw you need, and fuel type, voltage and frequency, then right model will be recommend.

Q2. What is your transport?
A: Generator set recommend ship by sea or by cargo on land.

Q3. What is your terms of payment?
A: 30% TT in advance as deposit, and 70% balance paid before delivery.

Q4. What is your terms of price?
A: EXW, FOB, CIF, CFR.

Q5. How about your delivery time?
A: Normally 25 days - 50 days after we receive advance payment. Depends on order size and generator model.

Q6. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery. Inspect by third party also acceptable.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier