Shengli Oil Field Shengli Power Generator 500kw 600kw 700kw Generator Parts Turbo Charger Hq145

Product Details
Customization: Available
Certification: CCC, COP, ISO9001, CE
Standard Component: Standard Component
Gold Member Since 2025

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

  • Shengli Oil Field Shengli Power Generator 500kw 600kw 700kw Generator Parts Turbo Charger Hq145
  • Shengli Oil Field Shengli Power Generator 500kw 600kw 700kw Generator Parts Turbo Charger Hq145
  • Shengli Oil Field Shengli Power Generator 500kw 600kw 700kw Generator Parts Turbo Charger Hq145
  • Shengli Oil Field Shengli Power Generator 500kw 600kw 700kw Generator Parts Turbo Charger Hq145
  • Shengli Oil Field Shengli Power Generator 500kw 600kw 700kw Generator Parts Turbo Charger Hq145
  • Shengli Oil Field Shengli Power Generator 500kw 600kw 700kw Generator Parts Turbo Charger Hq145
Find Similar Products
  • Overview
  • Product Parameters
  • Main Products
  • All series of Shengdong parts
  • Our Advantages
  • Packing & Delivery
  • Warehouse & Workshop
  • Customer visiting
  • FAQ
Overview

Basic Info.

Model NO.
HQ145
Technics
Forging
Material
Iron D5s, Ssteel AISI 304
Type
Turbocharger Assembly
Name
Shengdong/Chidong Turbocharger
Position Amounted
Turbocharger Assembly
Lead Time
1-2 Days
Brand
Datong
Model Number
W12V190.61.00
Turbo Charger 10
10W12V190.61.00
Turbo Charger 1
10W12V190.61.00- I
Turbo Charger 2
223.20gj.00
Turbo Charger 3
20gj.00ea
Turbo Charger 4
20gj.00b
Turbo Charger 5
20gj.00ea-2
Turbo Charger 6
Hq 145
Turbo Charger 7
20gj.00b-2
Turbo Charger 8
20gj.00eb
Turbo Charger 9
20gj.00ea-1
Transport Package
Plywood Case by Sea or Air or Land
Specification
50kg/set
Trademark
Shengdong/Datong
Origin
Shandong, China
HS Code
8409999990
Production Capacity
50 Set/Month

Product Description

Official agent for Jichai Chidong shengdong engine parts, OEM form factory.
 
190 engine parts Shengdong generator turbocharger assembly HQ145
Product Parameters
 
Part Name
Turbocharger assembly
Spare parts code
W12V190.61.00/10W12V190.61.00/10W12V190.61.00-I /HQ145
Application engine
Shengdong 12V190
Packing
Neutral packing(carton, plywood case), customized packing
Condition
100% brand new
 
Shengli Oil Field Shengli Power Generator 500kw 600kw 700kw Generator Parts Turbo Charger Hq145
Shengli Oil Field Shengli Power Generator 500kw 600kw 700kw Generator Parts Turbo Charger Hq145
Shengli Oil Field Shengli Power Generator 500kw 600kw 700kw Generator Parts Turbo Charger Hq145
 
Main Products
Gaskets: upper/lower gaskets, pump/turbocharger repair kits
Filter: oil filter, air filter, fuel filter, water filter
Pump: water pump,fuel pump, oil pump, sea water pump
Cylinder Block: cylinder liner, oil seal, crankshaft, main bearing
Camshaft: camshaft, gear, cam follower, rocker lever cover
Cyliner Head: intake/exhaust valve, guide, spring
Connecting Rod And Piston: piston, piston ring, piston pin,connecting rod bearing
Starter, alternator
Fan, fan hub, fan belt, fan spacer
Oil pan, exhaust manifold, connection, hose
Injector and injector parts
Turbocharger, flywheel, belt
We supply varieties of spare parts for brand engines. If you have specific part number or photos, please feel free to contact us for quotation.
Shengli Oil Field Shengli Power Generator 500kw 600kw 700kw Generator Parts Turbo Charger Hq145
All series of Shengdong parts
10W12V190.01.00 Cylinder block 10W12V190.09.00 Exhaust system
12vb.02.00 Crankshaft F700WTEM2.14.00 Gas intake piping
W12V190.03.00 Cylinder head 10W12V190.15.00C Null pick-up transmission
10W12V190.04.00 Oil pan 12V.17.00C Oil pump
W12V190.05.00 Piston and connecting rod 10W12V190.18.00 Oil filter
10W12V190.06.00-I Camshaft and gear train 12VB.19.00 Centrifugal filter
12VB.07.00 Damper 10W12V190.20.00A Lubricating piping
10W12V190.08.00 Intake system C12V190.21.00 Oil cooler
Other assemblies not list one by one.   Give me your list, quote you soon.

12v190 gas engine Piston and connection rod assembly (as reference)
Ref. No. Part Number Description
1. 12VB.05.14 Retain, piston pin
2. 12VB.05.08A Piston pin,piston pin
3. W12V190.05.01 Piston
4. 12VB.05.20 Ring,piston-oil
5. 12VB.05.11 Ring,piston-compression
6. 12VB.05.09B Ring,piston-compression (top)
7. 12VB.05.10.01 Connection rod
8. 12VB.05.10.08 Bushing,piston pin
9. 12VB.05.10.03 Bolt, connection rod
10. 12VB.05.10.04 Bearing, upper,connecting rod assembly
11. 12VB.05.10.05 Bearing, lower,connecting rod assembly
12. 12VB.05.10.02 Cap,connection rod
13. 12VB.05.10.06 Washer
14. 12VB.05.10.09 Nut, connecting rod
15. 12VB.05.10.07 Dowel pin
 

Chidong 12v190 diesel engine Piston and connection rod assembly (as reference)
 

Ref. No.
Part Number
Description
Z12VB.05.00-Qty
1
12VB.05.09B
Compression ring (top)
1
2
12VB.05.11
Compression ring
2
3
12VB.05.20
Spring expander oil ring
1
4
Z12VB.05.01C
Piston
1
5
12VB.05.08A
Piston pin
1
6
12VB.05.14
Retain, piston pin
2
7
12VB.05.10.07
Dowel pin
1
8
12VB.05.10.02
Connection rod cap
1
9
12VB.05.10.03
Connection rod bolt
4
10
12VB.05.10.05
Connection rod bearing, lower
1
11
12VB.05.10.04
Connection rod bearing, upper
1
12
12VB.05.10.06
Washer
4
13
12VB.05.10.09
Connection rod nut
4
14
12VB.05.10.01
Connection rod
1
15
12VB.05.10.08
Small end bushing
1
Our Advantages

1. We are professional in dealing with generators and spare parts for over 10 years.
2. Fine cooperation with original factories to make sure of goods steady and in time delivery.
3.After sale service available within 0- 12 hours.

Packing & Delivery
Shengli Oil Field Shengli Power Generator 500kw 600kw 700kw Generator Parts Turbo Charger Hq145
Shipment : Carton,plywood case or pallet will be used to pack goods.
Depends on emergency situation, shipment by sea,air or express(FedEx, TNT, DHL,UPS ) can be as choice
 
Warehouse & Workshop
Shengli Oil Field Shengli Power Generator 500kw 600kw 700kw Generator Parts Turbo Charger Hq145
Customer visiting
Shengli Oil Field Shengli Power Generator 500kw 600kw 700kw Generator Parts Turbo Charger Hq145
FAQ

Q1. What is your packing?
A:Carton, pallet or plywood case, depends on quantity.

Q2. Shipment?
A: By sea, air or express, as your needs. If in emergency, 8-15 days can arrive in Africa.

Q3.Payment Choice?
A: TT(30%+70%,or 100%),TT+L/C, Trade on MIC.

Q4. Lead time?
A: 1-7 working days, depends on quantity.

Q5.Storage capacity?
A: 99% Spare parts are available in stocks. 6-8 days deliver to Thailand by express.

You are highly welcomed to leave message and contact me by sending enquiry.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier