Customization: | Available |
---|---|
Conditions of Use: |
Marine, Land Use |
Usage: | Standby Unit, Common Units |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
JDEC Jichai Chidong engine spare parts 12VB.20.30 oil pressure adjusting valve
Jichai oil pressure adjusting valve, 12VB.20.30, used for Chidong 12V190 series diesel engine and Jichai gas engine.
We supply all kinds of spare parts for JDEC Jichai Chidong diesel & gas gensets, and all spare parts for Shengdong diesel & gas gensets with good quality and competitive price. Welcome to inquiry all the time!
Part Name | Oil pressure adjusting valve |
Spare parts code | 12VB.20.30 |
Application engine |
Jichai,Shengdong, Jichai chidong: 12V190, 6190, 8190 |
Packing |
Neutral packing(carton, plywood case), customized packing |
Condition | 100% brand new |
12VB.20.30 Oil pressure adjusting valve assembly photos and drawings:
Gaskets: upper/lower gaskets, pump/turbocharger repair kits |
Filter: oil filter, air filter, fuel filter, water filter |
Pump: water pump,fuel pump, oil pump, sea water pump |
Cylinder Block: cylinder liner, oil seal, crankshaft, main bearing |
Camshaft: camshaft, gear, cam follower, rocker lever cover |
Cyliner Head: intake/exhaust valve, guide, spring |
Connecting Rod And Piston: piston, piston ring, piston pin,connecting rod bearing |
Starter, alternator |
Fan, fan hub, fan belt, fan spacer |
Oil pan, exhaust manifold, connection, hose |
Injector and injector parts |
Turbocharger, flywheel, belt |
We supply varieties of spare parts for brand engines. If you have specific part number or photos, please feel free to contact us for quotation.
Q1. How to find correct parts?
A: Give me the spare part code or part name and machine model & brand, then we could choose the correct spare parts for you.
Q2. What is your transport?
A: For spare parts, we usually deliver by air or by express. For bulk cargo, we usually ship by sea to the port of destination. After shipment, we will track items until you receive them.
Q3. Terms of payment?
A: 30% TT in advance as deposit, and 70% balance paid before delivery.
Q4. Delivery time?
A: We will arrange shipment within 2-5 working days after we receive advance payment. Specific time depends on items and quantities of your order.
Q5. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
Q6. What is your packing?
A: We usually pack goods in neutral cartons and plywood cases. We also supply customized packing. We'll show you photos of items and packages before delivery.