The project is located in the basement of Rongcheng Garden Hotel,
Xiangfu Road,Changsha.using 3 sets1.1MW natural gas-fired internal combustion generator sets.
After the project is put into operation, the annual power generation capacity is
4.224 million kW, and the annual standard coal can be saved by 1348.6 tons.
The comprehensive utilization rate can reach 70%-85%.